What we procure
- Reinforcement bar in the diameters called up on the schedule
- Reinforcement mesh for slabs and screeds
- Binding wire and associated fixing consumables
- Project-specific steel items sourced against a BOQ or material schedule
Build Hub supplies construction steel in Zanzibar, procured against the bar bending schedule or BOQ rather than sold off a generic price list — because on steel, the schedule is the specification.
Steel is the line item where estimating error costs the most, in both directions: order short and the pour stops, order long and expensive material sits corroding in the salt air. Sending us the bar bending schedule or the reinforcement drawings lets us quote to the actual diameters, lengths and quantities.
Where the schedule is not yet issued, we can quote provisionally against the BOQ and firm it up once the details are released.
Steel delivered to a Zanzibar site should be stacked clear of the ground, kept off contaminated fill and covered where it will stand for any length of time. Light surface rust is normal and generally acceptable; flaking or pitted corrosion is not, and it starts faster here than inland.
Projects rarely order one material alone. These are the categories most often quoted alongside it.
Rebar is supplied against the schedule: diameters, lengths, shapes and quantities as drawn. Build Hub procures reinforcing bar in Zanzibar for slabs, columns, beams, foundations and reinforced blockwork.
View detailsPerimeter comes first on most Zanzibar projects: the plot is secured before the works start. Build Hub supplies barbed wire and associated fencing materials for site hoarding, boundary protection and completed-property security.
View detailsCement is the one material on site with a shelf life, so supply is a scheduling problem as much as a purchasing one. Build Hub supplies cement in Zanzibar coordinated against your pour and blockwork programme.
View detailsMaterial that arrives on the wrong day costs as much as material that never arrives. Build Hub delivers building supplies across Unguja on a planned schedule tied to the construction programme, not to whichever truck happens to be free.
View detailsIdeally the bar bending schedule or reinforcement drawings. Failing that, the BOQ lines with diameters and quantities so we can price accurately.
Yes — reinforcement mesh, bar and binding wire are supplied together against the same schedule.
Yes, and on coastal sites it is usually better: phased delivery against the pour programme keeps less steel exposed on site.
Upload your BOQ or send us your full material requirement and Build Hub will prepare a consolidated quotation.
Send your quantities, site location and required dates — or attach a BOQ or material schedule — and our team will come back with a written quotation and a delivery plan.